Interiors drawn and built by the same hands.
Arco designs and builds homes, restaurants and offices across Chicago. One team, one drawing set, one fixed price signed before anything is torn out.
- Project
- Your interior
- Drawn by
- Arco studio, Fulton Market
- Checked
- Maren Kessler, AIA
- Built by
- Tomas Reyes, licensed GC
- Price
- Fixed, signed before demo
An architect and a builder at the same table
Most renovations pass through three companies before a wall comes down. Ours pass through one studio, and the person who drew the room is on site the day it is built.
We started Arco in 2009 because clients kept paying for the gap between the drawings and the build. Now the drawings are ours, the carpenters are ours, and the price on page one of the contract is the price.
Maren Kessler leads design and Tomas Reyes runs every site. Between them sit architects, interior designers, project leads and the twelve carpenters of our millwork shop on Carroll Avenue: thirty-one people in all.
214 interiors, each with a sheet number
Every Arco project keeps the sheet number it was drawn under. Three recent ones, with the facts a client asks about first.
Homes, restaurants, clinics and offices from Evanston to Hyde Park.
Browse all projectsSix kinds of work. Every one priced first.
Starting prices are what the last twenty projects of each kind actually cost. Your fixed price arrives with the drawing set, before demolition.
Whole-home renovation
Gut renovations of condos, two-flats and brownstones, from structure to door hardware.
Kitchens and baths
One room rebuilt properly: layout, plumbing, tile, our own cabinetry and lighting.
Office and clinic fit-out
Workplaces, dental suites and studios fitted out around a move-in date.
Restaurant and hospitality
Dining rooms, bars and open kitchens built to an opening night you can announce.
Millwork and built-ins
Libraries, wardrobes and banquettes made in our Carroll Avenue shop.
Drawing set only
A permit-ready set and a line-item price you can take to any builder.
- Drawings, permits and inspections
- A named project lead and Friday site reports
- Five-year workmanship warranty
Oxbow Supper Club, drawn to the inch
How a 92-cover dining room in River North went from an empty shell to opening night in twenty-five weeks, laid out on one sheet.
Banquette moved 14" east to clear the service aisle. No change to price.
Twenty-seven weeks from site walk to keys
A typical whole-home project, week by week. Restaurants run faster and brownstones with structural work run longer; you will know which before you sign.
01Site walk
Ninety minutes in your space with an architect and a project lead. Free, with a written price range inside a week.
02Survey and concept
A laser survey of every wall, two layout options and a first finish palette you can touch.
03Drawing set, fixed price
A permit-ready set, a line-item price and one contract with the handover date written in.
04Permits and build
We file, demolish, rough in, install our millwork and finish. A site report lands every Friday.
05Handover
Punch list closed, as-built drawings in a binder, and the five-year warranty starts.
The design fee is credited in full against the build when you build with us. Walk away after the drawings and they are yours to keep.
What owners say after the punch list
Reviews are collected twice: at handover, and again a year later, when the drawers still close and the grout is still white.
- 94%handed over on the date in the contract
- 61%of our work comes from past clients and their referrals
- 0liens filed by a subcontractor since 2009
What people ask on the first site walk
Straight answers on money, permits and living through a renovation. Bring the rest to the walk itself.
Talk to a project lead, not a sales line.
- (312) 555-0164
- [email protected]
- Mon–Fri 8:30–6:00 · Sat by appointment
Q01How firm is the starting price?
Starting prices come from the last twenty projects of each kind we finished. Your fixed price arrives with the drawing set, line by line, and it only moves if you change the scope.
Q02Do you handle permits?
Yes. We file with the City of Chicago Department of Buildings under our own license, meet every inspector on site and keep the permit card posted. Residential permits usually take four to eight weeks, and the schedule allows for them.
Q03Can we live at home during the work?
For a single kitchen or bath, usually yes, with a temporary kitchen set up if you want one. For a whole-home renovation we recommend moving out for the middle twelve weeks, and we will tell you which weeks before you sign.
Q04What if you find something behind the walls?
Old buildings hide things. Every price carries a 6% contingency on its own line, and whatever is unspent comes back to you at handover. A bigger find is priced in writing before work continues.
Q05Will you build someone else’s drawings?
Yes, from $165 per sq ft for commercial fit-outs. We review the set first and send back written questions before we price it.
Q06What does the five-year warranty cover?
Workmanship on everything we built: millwork, tile, plaster, doors, and the plumbing and electrical installation. Manufacturer warranties on appliances and fixtures pass to you.
Walk us through the room. We will bring the tape measure.
Site walks run Monday to Saturday across Chicago and the near suburbs. Ninety minutes, free, and a written price range within seven days.