S-101
Whole-home renovation
Gut renovations of condos, two-flats and brownstones, including structure, systems and every finish.
- Structural and layout changes
- New electrical, plumbing and HVAC
- All millwork from our shop
Six kinds of work, each priced before demolition. Read the scope, the starting price and how long it takes on site.
Every price below includes drawings, permits, a named project lead, Friday site reports and the five-year warranty.
S-101
Gut renovations of condos, two-flats and brownstones, including structure, systems and every finish.
S-102
One room rebuilt properly, with a temporary kitchen set up if you are staying home.
S-201
Workplaces, dental suites and studios fitted out around a fixed move-in date.
S-301
Dining rooms, bars and open kitchens built to an opening night you can announce.
S-401
Libraries, wardrobes, stairs and banquettes, drawn and made in our Carroll Avenue shop.
S-501
A permit-ready set and a line-item price you can take to any builder, or back to us.
Most clients choose design and build. Some only want drawings, and some arrive with an architect already; both are welcome.
or 8% of the build estimate, whichever is higher
design fee credited in full against the build
commercial fit-outs from 1,500 sq ft
The questions that decide whether a renovation feels calm or chaotic, answered before you sign.
10% when you sign, then monthly against work completed and checked on site. The last 5% is held until your punch list is closed.
Yes, within about 25 miles: Evanston, Oak Park, Skokie, Highland Park and the near west suburbs. Beyond that we take on restaurants only.
Drawing work usually begins within three weeks of the site walk. Site work is booked about ten weeks out, so most clients start drawings first.
We specify loose furniture, lighting and rugs and order them at trade price plus a flat 10% handling fee, delivered and placed on handover day.
Yes, through a numbered change order with its price and its effect on the date. Nothing changes on site until you have signed it.