General contractorDenver, ColoradoEst. 1996
Buildings, delivered on the date on the sign.
Girder is a Denver general contractor for commercial, multifamily and civic buildings from $250K to $40M.
31 of 32 recent projects handed over on or before the contract date.
- Project
- Sunnyside Library & Rec
- Permit no.
- 2026-COM-01142
- GC license
- Denver Class A · GC-0418-A
- Superintendent
- Priya Nair
- Completion
- Apr 30, 2027
A family name on the license since 1996
Dale Hendricks started Girder with one truck and a framing crew. Dale's eldest, Jordan, runs it now with 62 people and the same rule about the sign.
Est. 1996
The finish date goes on the fence on day one. Then we build to it.
In 2011 we handed a building over three weeks late. Dale painted the next job's finish date on the site sign so every truck driver, neighbor and inspector could hold us to it. It has been on every sign since, and it changed how we plan, buy and staff a job.
- Founded1996 · Dale Hendricks
- PresidentJordan Hendricks
- On payroll62 people, 9 active sites
- Yard4120 Foundry Row, RiNo
Six things we build, priced before we start
Every line comes with a range you can budget against. The exact number is in your written estimate, five business days after the drawings land.
Commercial build-outs
Tenant improvements from cold shell to occupied, phased around your lease date.
- 2K–60K sq ft
- From $85 / sq ft
- 10–16 weeks
Ground-up commercial
Retail, office and mixed-use buildings, from site work to certificate of occupancy.
- 8K–90K sq ft
- From $1.2M
- 9–14 months
Multifamily
Wood frame over concrete podium, 40 to 250 units, built to a lender's draw schedule.
- 40–250 units
- From $14M
- 14–22 months
Education & civic
Schools, fire stations and libraries, with certified Davis-Bacon payroll every week.
- 10K–80K sq ft
- Public bid or CMAR
- 8–18 months
Industrial & cold storage
Tilt-up warehouses, freezer boxes and food plants with slab tolerances in writing.
- 20K–120K sq ft
- From $110 / sq ft
- 7–12 months
Preconstruction & design-build
Budgets, value engineering and one contract for the design and the build.
- Flat fee from $18,000
- Credited if we build
- 4–10 weeks
Built, signed and handed over
Type, size, year and neighborhood on every job. Ask for the owner's phone number on any of them.
Thirty years, counted
No rounding up. These are the numbers we put in front of bonding companies and lenders every spring.
Buildings delivered
Since the first framing job in Arvada, 1996.
Square feet built
From Golden to Commerce City, all inside 90 miles of the yard.
On or before the date
Our last 32 contract completion dates. We missed one by four days.
EMR safety rating
Three-year experience modifier. The industry average is 1.00.
Fifty-six weeks, posted on day one
A typical 60,000 sq ft ground-up building. Your version arrives with the bid, every phase dated, and it goes on the fence sign the week we mobilize.
Owners who would sign again
Three people who have held a Girder contract, in their own words. Their numbers are on our reference sheet.
They painted March 14 on the fence sign the week they mobilized. We cut the ribbon on March 3, with 118 leases already signed.
Three change orders in fourteen months, each priced in writing inside two days. Our board never once got a surprise.
The superintendent walked our clinic every evening with the punch list. We saw patients the Monday after final inspection.
Licensed, insured, bonded. Numbers below.
Every line is on file and current for 2026. Ask for a certificate of insurance and it is in your inbox the same day.
Send us the drawings.
PDFs, a CAD set or a phone photo of a sketch. A named estimator calls within one business day, and a written estimate follows inside five.
- Project
- Yours
- Permit no.
- We pull it
- GC license
- GC-0418-A
- Superintendent
- Named in the bid
- Completion
- Dated in the bid


