What we build

Services

Six ways we take a building from drawings to a certificate of occupancy, for owners spending $250K to $40M.

Scope

What each contract covers

Six services, each with the scope we carry, the range we work in and the price you can budget from.

Commercial build-outs work by Girder 01

Commercial build-outs

We take leased space from cold shell to occupied, working nights and weekends when the rest of the building stays open.

  • Demolition and abatement coordination
  • Framing, drywall and ceilings
  • MEP rough-in and finish
  • Furniture, signage and IT handoff

2K–60K sq ft · From $85 / sq ft · 10–16 weeks

Service details
Ground-up commercial work by Girder 02

Ground-up commercial

Retail, office and mixed-use buildings, from the first survey stake to the certificate of occupancy.

  • Site work, utilities and paving
  • Foundations and structure
  • Envelope, roofing and glazing
  • Commissioning and CO

8K–90K sq ft · From $1.2M · 9–14 months

Service details
Multifamily work by Girder 03

Multifamily

Wood frame over concrete podium, built to a lender's draw schedule with inspections booked weeks ahead.

  • Podium concrete and post-tensioning
  • Panelized wood framing
  • Unit finishes, floor by floor
  • Amenity decks and leasing office

40–250 units · From $14M · 14–22 months

Service details
Education and civic work by Girder 04

Education & civic

Schools, fire stations and libraries, built around occupied campuses and public meetings.

  • Public bid and CMAR delivery
  • Certified Davis-Bacon payroll
  • Phasing around school calendars
  • Community notices and site tours

10K–80K sq ft · Public bid or CMAR · 8–18 months

Service details
Industrial and cold storage work by Girder 05

Industrial & cold storage

Tilt-up warehouses, freezer boxes and food plants, with slab flatness written into the contract.

  • Tilt-up and pre-engineered metal
  • FF50 / FL35 slab tolerances
  • Insulated freezers to -20°F
  • Dock doors and levelers

20K–120K sq ft · From $110 / sq ft · 7–12 months

Service details
Preconstruction and design-build work by Girder 06

Preconstruction & design-build

We price the building before it is drawn, then hold one contract for the design and the build.

  • Conceptual budgets in 10 days
  • Value-engineering workshops
  • Architect and engineers under our contract
  • GMP before groundbreaking

Flat fee from $18,000 · Credited if we build · 4–10 weeks

Service details
Contracts

Three ways to hire a contractor

Pick the contract that matches how much you know today. We will tell you plainly which one fits your job.

Hard bid CM at risk Most chosen Design-build
We join After drawings are done During design Before design
Price fixed At bid opening At 60% drawings (GMP) At concept (GMP)
Who holds design Your architect Your architect Girder, one contract
Change-order risk Highest Shared Lowest
Typical schedule Longest Overlapped by 8–12 weeks Shortest
Best for Public work, simple scopes Complex or phased builds Owners who want one phone number
FAQ

Questions owners ask before signing

Straight answers about price, schedule and risk, from the people who write our contracts.

?

Not on the list? Robin Brooks, our chief estimator, answers the bid desk line directly.

(720) 555-0148

01How fast do I get a price?

A conceptual budget in ten business days from a sketch, and a detailed written estimate within five business days of a complete drawing set.

02Do you take projects under $250K?

Only for owners we have built for before. Below that, we will refer you to a smaller contractor we trust and have worked beside.

03How do you handle change orders?

Priced in writing with backup within 48 hours and approved by you before the work starts. No signature, no work.

04What happens if you miss the date on the sign?

Our contracts carry liquidated damages like anyone's. Across the last 32 projects we paid them once: four days, on a 2019 school addition.

05Which work do you self-perform?

Concrete, framing and finish carpentry are our own crews. Mechanical, electrical and plumbing go to subcontractors we have used for at least five years.

Bidding something this quarter?

Send the set by Friday and the written estimate lands the following Friday, signed by the estimator who priced it.