Since 1996

About

A Denver general contractor that posts the finish date on the fence and then hits it. Three decades, 214 buildings, one family name on the license.

Story

From one truck to 214 buildings

Thirty years of Girder, told through the six jobs and decisions that changed the company.

Tower cranes over a concrete frame on a Girder job

Cherry Creek Residences, 2025 · 9 stories · 210,000 sq ft

  1. 1996

    One truck, one framing crew

    Dale Hendricks registers Girder with a used pickup and four carpenters, framing houses in Arvada.

  2. 2004

    First commercial license

    Girder earns its Denver Class A license and builds its first ground-up retail building on South Broadway.

  3. 2011

    The sign rule

    After one late handover, Dale paints the finish date on the fence sign. It has been on every job's sign since.

  4. 2015

    Second generation

    Jordan Hendricks becomes president, and the company moves into a yard on Foundry Row in RiNo.

  5. 2019

    First tower crane

    Girder buys its own crane for Arvada Senior Commons and stops renting the critical path.

  6. 2024

    Front Range Builder of the Year

    Larimer Yard Lofts hands over eleven days early, 118 units, and the industry notices.

Rules

Six site rules, painted on the trailer door

Every Girder job trailer carries these on its door. Owners get a copy stapled to the contract.

Rule01

The finish date goes on the sign

Painted on the fence the week we mobilize, visible to anyone driving past.

Rule02

Friday report by 3 PM

Photos, a three-week lookahead and every open question, sent to the owner weekly.

Rule03

Change orders in 48 hours

Priced in writing with backup, before the work starts, never after.

Rule04

One superintendent, start to finish

The name on the sign on day one is the name on the sign at handover.

Rule05

Clean site by 3:30

Swept, locked and lit before the crew leaves. Neighbors notice, inspectors too.

Rule06

Stop-work belongs to everyone

Any person on site, any trade, any day, can stop work for safety without asking.

Safety

Everyone goes home at 3:30

A 0.71 EMR is not luck. It is a full-time safety director, a daily huddle and a rule that anyone can stop the job.

Ironworker in a harness tying rebar on a Girder site
0.71 Experience modifier rate
Three-year average · 1.00 is the industry
  • 6:45 AM huddle on every site, signed by every trade on the deck.
  • A full-time Director of Safety, Taylor Walsh, CSP, on site four days a week.
  • OSHA 30 for every superintendent and foreman we employ.
  • Zero lost-time incidents in 2025 across 412,000 hours worked.
Yard

Owned, not rented

The machines on the critical path live in our Foundry Row yard, so your schedule never waits on a rental counter.

Tools and equipment in the Girder yard
Equipment Owned Why it matters
Tower crane, 220 ft jib 2 Podium and mid-rise structure without a rental queue
Rough-terrain telehandlers 6 Material reaches the deck the hour it arrives
Boom and scissor lifts 18 Envelope and MEP crews never wait for access
Excavators, 20 to 35 ton 4 Site work starts the day the permit lands
Robotic total stations 3 Layout checked to 1/8 inch before concrete
Job trailers with sign kits 9 Every site gets an office, and the sign, on day one