Project G-0612

Larimer Yard Lofts

Five stories of wood frame over a concrete podium in RiNo, handed over eleven days early in 2024.

G-0612

118 apartments, eleven days early

Five stories of wood frame over a concrete podium, built for Northline Residential under a CM-at-risk contract.

Tower cranes over the Larimer Yard Lofts podium during construction

The brief

Northline Residential bought a one-acre rail yard parcel on Larimer Street with a construction loan that priced every month of delay. They needed 118 units leasing by spring 2024, a ground-floor coffee tenant open on day one and a podium that would satisfy a skeptical lender's inspector.

What we did

  • Podium in 11 weeks. Post-tensioned concrete poured with our own pump and crane, two weeks ahead of the baseline.
  • Panelized framing. Wall panels built off site and set floor by floor, cutting framing time by 30%.
  • Inspections booked ahead. Every city inspection on the calendar three weeks out, posted in the Friday report.
  • Leasing from floor two. Phased temporary certificates let Northline lease the lower floors while the roof was finished.
Job G-0612Larimer Yard
Owner
Northline Residential
Type
Multifamily, 5 over 1
Size
142,000 sq ft · 118 units
Contract
$31.4M · CM at risk
Permit no.
2022-COM-00877
Superintendent
Hank Morrow
Date on sign
Mar 14, 2024
Handed over
Mar 3, 2024
11 days early · 3 change orders

They painted March 14 on the fence sign the week they mobilized. We cut the ribbon on March 3.

Andrea Feld · Northline Residential